Back to the blog
Guides

Prefab and modular homes in Spain: prices 2026 by type, what turnkey includes and licensing in Andalusia

Vladimir Shokov By Vladimir ShokovFounder, EVS PROPERTY GROUP 18 November 2026 · 9 min read
Casas prefabricadas: precios 2026 por tipo, qué incluye el llave en mano y licencia en Andalucía

When buyers compare modular homes, Spain prices in 2026 run from about €10,000 for a basic mobile home to well over €300,000 for large turnkey models, according to idealista/news; for concrete systems, the same outlet puts the indicative range at €800–2,800/m². The figure that really matters, though, is the finished project: house, tax, licence, utility connections and plot.

This guide brings together indicative prices by type of house, each with its source, a worked turnkey example, build times compared with conventional construction and the essentials of Andalusian planning law (LISTA) before you buy a plot in Málaga or anywhere on the Costa del Sol.

How much does a prefab house cost in 2026?

Price depends mainly on the construction system, the floor area and what the manufacturer includes. Every figure in the table is indicative, comes from catalogues or property portals and may change without notice.

Type Indicative price Example Source
Timber €1,200/m² (minimum 100 m²) Daype Marta 93 m²: kit €39,900, installed €73,243 (excl. VAT) idealista/news (Hogar Madera); Daype price list
Concrete €800–2,800/m² Casas Cube 150 (150 m²): €214,600 turnkey + 10% VAT idealista/news
Modular (concrete/design) From €113,885 (basic package) to €306,645 turnkey Modular Home Rothko, 195 m² idealista/news
Steel frame Around €1,300/m² on average 150 m²: €250,000 turnkey Habitissimo
Mobile homes €10,000–50,000; 40–75 m² models: €70,000–130,000 Alucasa Denia 40 m²: from €57,055 idealista/news

Compare carefully: some prices include VAT and others do not. Daype publishes its prices excluding VAT, Casas Cube quotes plus 10% VAT and, according to idealista/news, the Maestro Casas Don model (84 m²) costs €66,108 including VAT. At the top end, the same outlet cites the inHAUS Tiana model (309 m²) from €865,800.

Cheap prefab homes: why does the kit not cost the same as the installed house?

The usual hook for cheap prefab homes is the kit price, meaning unassembled materials. On Daype's price list, the 100 m² Moderna model costs €67,475 as a kit and €104,868 installed; the 125 m² Toledo, €49,000 against €90,953. Once assembled, the house costs between 1.5 and 1.9 times the kit price.

Concrete works in a similar way: idealista/news warns that the lowest figures often cover only the structure. For an affordable timber home, the sensible approach is to choose a standard, compact model, ask for the installed price in writing and check line by line what is left out.

All-inclusive prefab homes: prices and what is really included

Even turnkey has small print. Home3 includes design, manufacture, transport, assembly and standard finishes, but not foundations, utility connections or municipal fees. Casas Carbonell quotes prices with 10% VAT, yet transport and assembly are only included within the province of Valencia and the unloading crane is extra. The plot is never included.

On VAT, the Spanish Tax Agency states that, as a general rule, 10% applies to construction work on buildings intended mainly as homes where the contract is directly between the developer and the contractor; materials bought separately and architect's fees carry the standard 21% rate. Check your own situation.

Worked turnkey example (illustrative)

Item Amount Source
100 m² timber house, installed (excl. VAT) €104,868 Daype price list (Moderna)
VAT 10% ≈ €10,487 Spanish Tax Agency
Design and technical services ≈ €19,000 Visa Homes
Licence, ICIO tax and fees 5,000–€8,000 Visa Homes
Utility connections and contingencies 13,000–€28,000 Visa Homes
Indicative total (excluding plot) ≈ 152,000–€170,000 Our calculation

This is an illustration on your own urban plot, not a quote. It excludes foundations unless the manufacturer includes them, so ask for that item in the quote. The ICIO construction tax varies by town hall, and Visa Homes recommends setting aside 10–15% for contingencies.

How long does it take, and is it cheaper than a conventional build?

Speed is the big advantage. Home3 quotes 4 to 6 months from the building licence, as modules are made while the foundations go in, compared with 14–24 months for a conventional build by its own comparison. Habitissimo estimates around 3 months for steel and inHAUS 5 months.

On cost, the gap is smaller than it seems. According to Sociedad de Tasación, cited by consumer group OCU in March 2026, new-build construction cost in Spain was €1,323/m² in September 2025; OCU puts a 70 m² mid-quality terraced house in Seville at €1,870.11/m². A prefab is not necessarily cheaper per square metre: what it offers is speed and a fixed price.

What licence do I need for a prefab house in Andalusia?

Andalusia's planning law (LISTA, Law 7/2021) requires a prior municipal planning licence for any works, construction, installation or use of land. In addition, companies that sell or install prefabricated buildings suitable for residential use must ask the client for the licence or the responsible declaration before installing, selling or renting, and keep a copy for 6 years; failing to do so is an administrative offence.

As a home, the house is a building under Spain's Building Act: it needs an architect's project, a building licence, compliance with the Technical Building Code (CTE) and, once finished, a first occupation licence or declaration. In December 2024 the Supreme Court treated a mobile home as a prefabricated house rather than a trailer, so it also needs a licence.

What about rural land? What can happen

On rural land, a detached house is only possible as an extraordinary action: you need prior authorisation from the town hall before the licence, the response can take up to 6 months and silence means refusal. If granted, a compensatory levy of 15% of the build budget applies. Spain's national land law also requires express authorisation to place prefabricated houses, whether temporary or permanent. LISTA fines reach €120,000 or more for very serious offences, and the authorities can order demolition for 6 years after completion, or with no time limit in areas such as rural coastal land or flood zones.

There is also a criminal route: the Criminal Code punishes developers, builders or site managers of works that cannot be authorised on non-developable land with 1 to 3 years in prison, plus a fine and disqualification. As reported by idealista/news, the Supreme Court in 2026 upheld 3-month prison sentences for buyers of rural plots with mobile homes in Cártama, and in Casabermeja prosecutors are seeking 15 months over a mobile home on wheels; that case is awaiting trial and there is no verdict. We cover this in detail in our guide to container homes in Andalusia.

What to check before buying a plot on the Costa del Sol

  • Land classification: request a planning certificate or report from the town hall (urban, ordinary rural or protected rural).
  • Land Registry extract (nota simple) and a Cadastre check.
  • That there is no open planning enforcement case.
  • Access for lorry and crane, water and electricity.
  • On rural land, whether prior authorisation for a detached home is realistic at all; placing the house and living in it without one is illegal, and wheels do not change that.

The safe route is an urban plot with a licence. For reference, these are median asking prices for homes from the EVS market report of November 2026:

Area Median price €/m²
Costa del Sol €649,000 €4,744
Mijas €549,000 €4,317
Estepona €625,900 €4,825
Marbella €950,000 €6,053
Malaga €625,800 €4,977

Bear in mind that a home's €/m² includes land and location, whereas a prefab price covers only the house, so the two are not directly comparable.

Can you get a mortgage for a prefab house?

Yes, as a self-build mortgage. BBVA explains that funds are released in stages against construction certificates, that 30–40% of your own funds is usually required, and that you need a registered plot, an approved architect's project, a licence and a budget.

The condition is that the house counts as real estate: buildable land, an approved project, a licence, fixed foundations and registration as a completed building. An unregistered mobile home on rural land does not qualify; only a personal loan would remain.

Conclusion

A prefab house can make sense for its speed and fixed price, but the real budget lies in the plot, the licence and everything the catalogue leaves out. If you are looking for an urban plot on the Costa del Sol, or want to compare with finished homes in Mijas, Estepona, Marbella or Málaga, the EVS Property team can help you review the options before you decide.

Frequently asked questions

What can a prefab house be worth?

According to idealista/news, from about €10,000 for a basic mobile home to over €300,000 for premium models. Once licensed, on foundations and registered, it is a home like any other and its value depends mainly on the plot and location.

What permit do I need to put up a prefab house?

In Andalusia, a municipal planning licence with an architect's project complying with the CTE and, once finished, an occupation licence or declaration. On rural land you also need prior authorisation from the town hall, which is not always granted.

What are the drawbacks of a prefab house?

The catalogue price is not the final price, it needs a buildable plot and a licence, it is only mortgageable once fixed and registered, and transport and crane costs depend on access to the plot.

How much do all-inclusive prefab homes cost?

In our illustrative example, a 100 m² timber house comes to around €152,000–170,000 including VAT on the house, design, licence and connections, excluding the plot and foundations if the manufacturer does not include them.

Can you put a prefab house on rural land in Andalusia?

Only as an extraordinary action, with prior authorisation and a licence, plus a 15% compensatory levy. Without them you risk fines, demolition and even criminal proceedings.

Related articles